Saraya Aqaba – Zone I3 & K

Project Description

Scope of Al Fadel Skeleton and finishing work :

Excavation work, Skeleton work & Finishing work including Block work, Plastering work interior and exterior, paintwork, interior and exterior walls, ceramic work, marble flooring and cladding work, exterior and interior stonework, terrazzo tiling work, roofing work, water & thermal insulation work, interior stone and marble decoration work, Stainless steel work..

Scope of Al Fadel Electrical works :

conduit & underground services, wiring, volt cable, Supply and installation and commission, panel boards, lighting fixtures, and underfloor trucking. volt, cable, disconnecting devices, automatic transfer switch package, HV switchgear, low voltage switchboard., lightning protection system. fire alarm detection system, telephone installation, addressable security &information system,, public address & sound system, paging system, two-way radio system, community antenna TV system, security alarm system, tour watch manager system, motor control center, package engine generator set, building management system, HV switchgear., automatic transfer switch package.

Scope of Al Fadel Mechanical works :

Boiler, chillers, storage heat exchangers, fan coil units., air handling units, fresh air handling units, split air conditioning unit mechanical general requirements: pipes for drainage and rainwater system, pipe & pipe fittings, LPG pipes, services penetration & supports fireproofing. In addition to valves, cocks & faucets, chillers/heating water system, pressure differential valve, hot water In-line return circulation pump, fire fighting pump set, water reservoirs accessories, particulars, drainages system, water purification system – duplex type (Softener), automatic sprinkler fire protection system, air handling units, swimming Poll equipment, water foundation nozzles, landscape irrigation system.

More Information

Project Description:
Al Fadel's Scope of work is part of the Saraya Aqaba Resort project. Those zones are Residential apartments of various sizes and classifications. Zone I3 is made up of 4 Buildings, making up 74 apartments with a total gross built-up area of 16,356 m².
Zone K is made up of 13 Buildings, making up 207 apartments, with a total gross built-up area of 44,331 m². Both Zones I3 & K are made up of parking, the Ground floor & three other floors. Zone I3 has a total of 9 swimming pools & Secondary Water supply tank of 330 m³.